STAIRS & PLATFORMS FOR ARCELOR MITTAL STEEL
  • STAIRS & PLATFORMS FOR ARCELOR MITTAL STEEL
  • STAIRS & PLATFORMS FOR ARCELOR MITTAL STEEL
  • STAIRS & PLATFORMS FOR ARCELOR MITTAL STEEL
  • STAIRS & PLATFORMS FOR ARCELOR MITTAL STEEL
  • STAIRS & PLATFORMS FOR ARCELOR MITTAL STEEL

THE CHALLENGE

· Assembly of new elements (stairs, railings,
platforms) on an existing structure
· To design the stairs, railings, platforms and
grills without errors

THE SOLUTION

· The 3D view mode, user joints & advanced
feature set for stairs, railings, allowed the
engineers to finish the project in only
three weeks
· Stairs, railings, platforms & grills designed
without any errors using the stairs &
railings set

“I have been working with AutoCAD, especially in
3D view, for a very long time now. I think it is safe
to say that it would have been very difficult for us
to model the entire structure in AutoCAD. The main
structure has a cylinder shape, and the platforms
and the stairs are placed around it, at 360°. Without
Advance Steel, the execution would have taken too
long.”
Gheorghe CEPRAGA
Engineer
Uzinsider Engineering

USERS’ BENEFITS

· Fast learning curve
· 3D view mode
· Stairs and Railings set

  • Architecture office: Uzinsider Engineering
  • Location: Arcelor Mittal Steel Plant, Galati,
    Romania
  • Project Details: The project consisted of the
    assembly of new elements (stairs, railings,
    platforms) on an existing structure - the dust bag
    for the 5th furnace of the Arcelor Mittal Steel
    Plant

GRAITEC GROUP 2017 At GRAITEC we take privacy seriously. Please read our privacy policy.