Advance Design success story: STRANA Experts-Conseils inc.

Le HUB project integrates offices, shops, a gas station, restaurants and automated parking in the same building. With its unique architectural signature, this project will be a landmark in the City of Saint-Hubert, located at one of the major gateways to the City and linking the Promenades Saint-Bruno to the highway.

Partager

Advance Design success story: STRANA Experts-Conseils inc.

Company: STRANA Experts-Conseils inc.

Project submitted by Jimmy Gauthier,  STRANA Experts-Conseils inc., Quebec, Canada

Project 

Le HUB project integrates offices, shops, a gas station, restaurants and automated parking in the same building. With its unique architectural signature, this project will be a landmark in the City of Saint-Hubert, located at one of the major gateways to the City and linking the Promenades Saint-Bruno to the highway.

The amalgamation of functions within the same building offers a new formula for cohabitation in the city. The integration of a service station underneath the building consolidates the development of the site by reducing the footprint and optimizing the green spaces.

The automated multi-story car park maximizes the number of underground parking spaces and minimizes the number of outdoor spaces.

User benefits:

The main benefits obtained during the design process with Graitec Advance Design software are as follows:

  • Quick modeling of the structure;
  • Easy to model with the integration of grid-lines;
  • Easy to create elements by level based on the nomenclature of the model;
  • Easy to identify the components of the structure;
  • Easy display view by level;
  • Easy to integrate loading cases;
  • Automatic seismic loading case;
  • Automatic snow loading case;
  • Automatic wind loading case;
  • Easy to generate foundation wall earth pressure load case.

Design of an aluminium deck on a steel girders bridge with Advance Design America – Bridge

In 2020-2021, WSP was chosen to prepare the detailed plans and specifications for the construction of a full-scale prototype bridge…

Advance Design success story: Sentier des Cimes – LH2

Sentier des Cimes - LH2 : The Entry Tower on Sentier des Cimes project consists of a 1.5 km pedestrian…

Advance Design success story: A/B Jetty Project – Pomerleau

The main goal of this mandate was to design a falsework steel structure seating on temporary piles. The structure supported…