Hinkley Point C

Hinkley Point C

Partager

Hinkley Point C

Context

In the framework of the renewal of the UK nuclear park, EDF built two EPR Reactors on the Hinkley point C

Challenge

Following an international call for tenders and two years of studies Arma plus has been choosen to manage the supply chain of the whole 170 000 tons of rebars

Solution

Automated exchange of technical and administrative data with the subcontractors.
Real time control of the production advancement, along with the traceability, and localization of each rebar element
Worflow link between Hinkley and the sub contractors for the construction site monitoring