{"id":13173,"date":"2025-09-18T09:01:54","date_gmt":"2025-09-18T07:01:54","guid":{"rendered":"https:\/\/graitec.com\/ca-en\/?p=13173"},"modified":"2025-09-17T19:35:41","modified_gmt":"2025-09-17T17:35:41","slug":"data-driven-vs-data-centric-for-owners","status":"publish","type":"post","link":"https:\/\/graitec.com\/ca-en\/blog\/data-driven-vs-data-centric-for-owners\/","title":{"rendered":"Revealing Data-Driven vs Data-Centric Approaches for Construction Owners"},"content":{"rendered":"<p><span style=\"color: #ffffff;\">Data-driven vs Data-centric, construction project data insights<\/span><\/p>\n<p>Let\u2019s chat about something that might sound a bit nerdy but is super important when managing your projects: the difference between being data-driven and data-centric. Both buzzwords revolve around data, but they\u2019re not quite the same. So, what\u2019s the scoop?<\/p>\n<h2><span style=\"color: #3366ff;\">What\u2019s the Deal with Being Data-Driven?<\/span><\/h2>\n<p>Being data-driven is like having a trusty compass in the wilderness: data is what guides your decisions and actions, and you\u2019re all about collecting data to analyze and gather insights. In the world of construction, this could mean diving into budget reports, scheduling timelines, and resource management. But here\u2019s the kicker: without a solid plan to control all that data, it can turn into a mess.<\/p>\n<p>And companies are catching on. According to the<a href=\"https:\/\/www.autodesk.com\/design-make\/research\/state-of-design-and-make-2025\" target=\"_blank\" rel=\"noopener\">\u00a02025 State of Design and Make Report<\/a> by Autodesk, just 26% of leaders at data-forward organizations \u201csee cost as a top concern\u201d\u2014and that\u2019s compared to 35% of leaders at other companies. Data is here to stay, and a data-driven strategy keeps that knowledge at the forefront.<\/p>\n<figure class=\"nspb-cmsFigure nspb-loadingOverlay nspb-lazyLoading\"><img decoding=\"async\" class=\"alignleft wp-image-32663\" src=\"https:\/\/asti.com\/wp-content\/uploads\/sites\/32\/2025\/09\/data-driven-data-centric-300x120.jpg\" alt=\"blue, green, pink neon coils wrapped around black cylinders, background data lists, data-driven-data-centric\" width=\"653\" height=\"261\" \/><\/figure>\n<h2><span style=\"color: #3366ff;\">Going the Extra Mile with Data-Centric Strategies<\/span><\/h2>\n<p>Now, if you really want to elevate your data game, you should consider a data-centric strategy. This means creating a well-organized framework around your data. Instead of just hoarding data like a dragon with a pile of gold, you standardize and organize it for easy access and use. This is a big win for construction owners because it paves the way for simple collaboration and communication, no matter where your team is located.<\/p>\n<p>To kick off a data-centric model, you\u2019ll want to embrace smart software that integrates data from various sources. Take <a href=\"https:\/\/graitec.com\/ca-en\/products\/autodesk-construction-cloud\/\">Autodesk Construction Cloud<\/a>, for example. It\u2019s a connection-first platform that brings together construction teams, making it a breeze to collaborate and make data-savvy decisions. Everything is centralized, making your projects more accessible and simple than ever.<\/p>\n<hr \/>\n<p><span style=\"font-size: 18pt;\"><em>Learn about better cost management using Autodesk Build in the free eBook: <strong><a href=\"https:\/\/graitec.com\/ca-en\/white-papers\/connecting-construction\/\">The Importance of a Common Data Environment<\/a><\/strong>.<\/em><\/span><\/p>\n<hr \/>\n<h2><span style=\"color: #3366ff;\">Data-Driven vs Data-Centric: Unified Data Strategy Matters<\/span><\/h2>\n<p>Just collecting data from all over isn\u2019t enough; without a unified strategy, you might end up with data silos that stifle teamwork. That\u2019s where tools like <a href=\"https:\/\/graitec.com\/ca-en\/products\/build\/\">Autodesk Build<\/a> come in handy. This solution not only centralizes your project data, but it also promotes effective team communication. Everyone can work off the same model, making those pesky compatibility issues a thing of the past.<\/p>\n<p>With Autodesk Build, your teams get real-time access to project data, which means they can spot trends and make smart decisions on the fly. For instance, if one contractor keeps running into hiccups, project managers can quickly pull up reports and dashboards to uncover the root of the problem.<\/p>\n<table style=\"border-collapse: collapse; width: 100%;\">\n<tbody>\n<tr>\n<td style=\"width: 50%;\">\n<h2><span style=\"color: #3366ff;\">BIM: The Ultimate Data-Centric Example<\/span><\/h2>\n<p>Speaking of great examples, let\u2019s talk about<a href=\"https:\/\/graitec.com\/ca-en\/ultimate-guide-to-revit\/\"> Building Information Modeling (BIM)<\/a>. It\u2019s a shining star in the Architecture, Engineering, and Construction (AEC) world! Unlike the old-school 2D drawings, BIM allows for an interactive 3D model of your project, making it more accessible to everyone involved. The magic happens when this model is open for collaboration across all teams.<\/p>\n<p>When project teams can access the same BIM model from anywhere, it boosts coordination and communication to new heights. This is where Autodesk Construction Cloud can really shine, enabling seamless collaboration and data sharing among all project players.<\/td>\n<td style=\"width: 50%;\"><img decoding=\"async\" class=\"alignnone wp-image-13178\" src=\"https:\/\/graitec.com\/ca-en\/wp-content\/uploads\/sites\/19\/2025\/09\/data-driven-data-centric-person-300x200.jpg\" alt=\"person thinking and pointing at computer monitor, data-driven vs data-centric\" width=\"519\" height=\"346\" srcset=\"https:\/\/graitec.com\/ca-en\/wp-content\/uploads\/sites\/19\/2025\/09\/data-driven-data-centric-person-300x200.jpg 300w, https:\/\/graitec.com\/ca-en\/wp-content\/uploads\/sites\/19\/2025\/09\/data-driven-data-centric-person-768x513.jpg 768w, https:\/\/graitec.com\/ca-en\/wp-content\/uploads\/sites\/19\/2025\/09\/data-driven-data-centric-person-160x107.jpg 160w, https:\/\/graitec.com\/ca-en\/wp-content\/uploads\/sites\/19\/2025\/09\/data-driven-data-centric-person-500x334.jpg 500w, https:\/\/graitec.com\/ca-en\/wp-content\/uploads\/sites\/19\/2025\/09\/data-driven-data-centric-person.jpg 824w\" sizes=\"(max-width: 519px) 100vw, 519px\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<h2><span style=\"color: #3366ff;\">Wrapping It Up: Welcome to the Future of Construction<\/span><\/h2>\n<p>As the construction landscape keeps changing, shifting to a data-centric strategy is becoming a must for project owners. By leveraging platforms like Autodesk Construction Cloud and Autodesk Build, you can create a dynamic environment that fosters teamwork and drives smart decision-making. Ready to level up from a data-driven to a data-centric strategy? Consider reaching out to\u00a0<strong><a href=\"https:\/\/graitec.com\/ca-en\/about-graitec\/contact\/\">Graitec North America<\/a> <\/strong>for some top-notch guidance!<\/p>\n<p><span style=\"font-size: 12pt;\"><em>Remember, the future of construction is all about harnessing the power of data in style. Let\u2019s build it together!<\/em><\/span><\/p>\n<figure class=\"nspb-cmsFigure nspb-loadingOverlay nspb-lazyLoading\"><a href=\"https:\/\/graitec.com\/ca-en\/about-graitec\/contact\/\"><img decoding=\"async\" class=\"alignleft wp-image-28887\" src=\"https:\/\/asti.com\/wp-content\/uploads\/sites\/32\/2024\/07\/acs-cost-mgmt-cta-graphic-300x108.jpg\" alt=\"construction cost management, construction cost management, Autodesk Build features\" width=\"536\" height=\"193\" \/><\/a><\/figure>\n<p><span style=\"color: #ffffff;\">data-driven vs data-centric, construction project data insights<\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Data-driven vs data-centric for owners: driven gives data collection direction; centric provides a critical framework for use and decision-making.<\/p>\n","protected":false},"author":49,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[808,463,401,866,708,776,600],"tags":[469,814,1142,614,648,2111,1146,720,1290,1973],"class_list":["post-13173","post","type-post","status-publish","format-standard","hentry","category-aec","category-autodesk-construction-cloud","category-bim","category-build","category-connected-construction","category-data","category-digital-transformation","tag-autodesk-construction-cloud","tag-bim","tag-building-owners","tag-collaboration","tag-communication","tag-connected-data","tag-construction-data-insights","tag-cost-management","tag-data-driven-decisions","tag-informed-decisions"],"acf":[],"_links":{"self":[{"href":"https:\/\/graitec.com\/ca-en\/wp-json\/wp\/v2\/posts\/13173","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/graitec.com\/ca-en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/graitec.com\/ca-en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/graitec.com\/ca-en\/wp-json\/wp\/v2\/users\/49"}],"replies":[{"embeddable":true,"href":"https:\/\/graitec.com\/ca-en\/wp-json\/wp\/v2\/comments?post=13173"}],"version-history":[{"count":0,"href":"https:\/\/graitec.com\/ca-en\/wp-json\/wp\/v2\/posts\/13173\/revisions"}],"wp:attachment":[{"href":"https:\/\/graitec.com\/ca-en\/wp-json\/wp\/v2\/media?parent=13173"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/graitec.com\/ca-en\/wp-json\/wp\/v2\/categories?post=13173"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/graitec.com\/ca-en\/wp-json\/wp\/v2\/tags?post=13173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}