How to Back Up Autodesk Forma and Procore Project Data (And What Happens When You Don’t)

20 August 2026Autodesk Construction Cloud, Backup, bim, cloud backup, Construction Data, File Sync

GRAITEC Expert

Partager

blog-banner_why-aec-system-integration-is-now-a-digital-delivery-imperative.jpg

Most construction firms assume their project data is backed up because it lives in the cloud. It isn’t, quite. Autodesk Forma and Procore are highly available platforms, and neither is likely to lose your data through infrastructure failure. But availability protects against their failure modes, not yours — and the overwhelming majority of construction data loss is caused by something happening inside the account, not to it.

Does Autodesk Forma or Procore back up your project data for you?

Not in the way most firms assume. Both platforms maintain infrastructure-level resilience and internal redundancy, but that protects against platform failure, not against deletion, permission changes, project archival, licence lapses or a departing subcontractor taking a folder with them. Under a shared responsibility model, the platform is accountable for the service and your firm is accountable for holding an independently controlled, recoverable copy of the project record.

What causes data loss most often in construction environments?

Rarely a platform outage. In practice the common causes are accidental deletion or overwriting by users, permission and folder-structure changes that hide data rather than delete it, subcontractor and joint-venture offboarding at the end of a work package, project archival or licence expiry that puts historic projects out of reach, and ransomware reaching cloud-synced folders from an infected local machine.

The pattern worth noticing is that most of these are routine administrative events, not disasters. Nobody escalates a folder permission change. That is exactly why the loss usually goes unnoticed for months — typically until someone needs the data for a closeout package or a dispute.

What lessons come from major construction data loss incidents?

Three recur. First, the loss is usually discovered long after it happened, when the data is needed for handover, warranty or a claim, at which point the source project may already be closed. Second, the damage is rarely the files themselves but the surrounding context: version history, metadata, approval status and the audit trail proving what was issued when. Third, firms that recovered well had a copy in a location they controlled, with a restore process someone had actually tested.

Contractual exposure is the part most often underestimated. A project record that cannot demonstrate which drawing revision was issued for construction, and on what date, is a weak position in a delay or defect claim — regardless of whether the work was done correctly.

How to Back Up Autodesk Forma and Procore Project Data

How frequently should construction data be backed up?

Backup frequency should follow how fast the data changes and how costly it would be to reconstruct. Active projects with daily drawing issues, RFIs and site photos generally warrant a daily or near-daily backup; projects in slower phases may be weekly; and completed projects need a full archive captured before the project is closed or the licence lapses. The interval you choose defines how much work your team would have to redo — set it against tolerable rework, not storage cost.

Project state Suggested interval Why
Active delivery Daily or near-daily High change rate; a week of lost issues is a week of rework
Slow phase / pre-construction Weekly Lower change rate, lower reconstruction cost
Closeout and handover Daily until sign-off, then full archive The final record carries the longest retention obligation
Completed / archived One-time archive with all versions Capture before licences lapse or projects are closed

How do firms plan for data recovery during an active project?

Recovery planning on a live project means deciding in advance how much data you can afford to lose, how quickly the team must be working again, and who is authorised to trigger a restore. Define where the backup lives, confirm the restore path is usable by someone other than its author, and agree how a partial restore works, because in practice the need is almost always one folder or one document set, not the whole project.

What stakeholders should be involved in backup planning?

Backup planning fails when it is treated as purely an IT task. IT owns the destination, credentials and scheduling; document control owns what a usable archive looks like and validates it; BIM/VDC owns model and metadata integrity; the project manager owns scope and sign-off; and an operations or executive sponsor owns retention policy and commercial risk. IT can configure the backup, but only document control can confirm the archive is actually usable.

What distinguishes construction-grade backup from generic cloud backup?

Generic backup tools copy files. Construction project data is not just files, it is files plus metadata, version history, revision relationships and folder governance, spread across platforms that each expose data differently. A construction-grade approach connects to the construction platforms directly, preserves metadata and versions, and produces per-file evidence of what was copied, skipped or failed.

Generic file backup Construction-grade backup
Scope Files and folders Files, metadata, versions and folder structure
Platform access Local drives or generic cloud storage Connects directly to Forma / ACC, BIM 360, Procore, SharePoint and others
Version history Latest file only All-version capture for archive and closeout
Evidence Job succeeded or failed Per-file activity log, with retry of failed files
Selectivity Everything, or manual selection Filter by metadata, folder, file type or size

 

How to configure a controlled backup with File Sync

1.   Create a workspace, then create a sync for each project or platform in scope.

2.   Select the source: Autodesk Forma / ACC, BIM 360, Procore, SharePoint, Bluebeam, Egnyte, Dalux or a Windows location, then the project and folder.

3.   Select the destination your firm controls, and enable create source folder in destination so the structure is preserved.

4.   Enable Include Metadata so the archive stays searchable, and Sync All Versions where the full revision trail is required.

5.   Set the schedule to match the project’s change rate, and use filters to exclude file types or sizes that don’t belong in an archive.

6.   Leave “Delete files not found in source” switched off. It keeps a mirror faithful, but it also propagates deletions into your backup, the opposite of what an archive is for.

7.   Run the sync, then review the activity log and retry any failed files directly from it.

How do teams test data recovery processes effectively?

Test the restore, not just the backup. A backup that runs successfully every night still fails you if nobody has confirmed the data comes back usable. An effective test restores a representative folder to a working location and has document control verify file counts, folder structure, metadata and version stacks, performed by someone who did not build the backup, so the process is proven rather than the person.

Run this once per project at minimum, and again before any project is closed or a licence is surrendered. That last window is the one firms most often miss.

Backup readiness checklist

•    Which platforms and projects are in scope, and which data types within them

•    Whether the backup is a current mirror, a retained archive, or a closeout package

•    Where the backup lives, who owns that location, and who can trigger a restore

•    Which metadata fields are required for the archive to remain searchable

•    Whether the latest version is enough, or the full revision trail is required

•    Backup frequency per project state, and who is notified of failures

•    When the restore test happens, and who signs it off

What happens to project data before a licence lapses or a project is closed

How to Back Up Autodesk Forma and Procore Project Data (And What Happens When You Don’t) | Graitec - UK

Protect the record, not just the files

The firms that recover well are not the ones with the most storage, they are the ones who decided in advance what a usable archive looks like and proved they could restore it. Graitec can help you scope what needs protecting across Forma, Procore and your wider estate, and configure a File Sync backup workflow with the evidence to back it up.

Book a construction data resilience assessment with Graitec.
Start Your Free Trial Now

Related content

4 Ways to Become more Efficient with Revit PowerPack

14 November 2023PowerPack RevitCarol Dunn

Boost the productivity of your design team by providing Revit PowerPack tools that help with modeling, documentation and data propagation.