Procore vs. Autodesk Forma (ACC): Which One Do You Need — Or Do You Need Both?
09 September 2026Autodesk Construction Cloud, Backup, bim, cloud backup, Construction Data, File Sync

“Procore vs Autodesk” is one of the most searched comparisons in construction technology, and most of the content answering it is written as if the outcome is a single winner. In practice, it rarely is. Procore and Autodesk Forma (formerly Autodesk Construction Cloud, or ACC) are built for different parts of the same project, and the majority of firms of any size end up running both, not because they couldn’t decide, but because different stakeholders on the same job genuinely need different tools.
This article compares what each platform actually does well, why the “versus” framing breaks down once real project teams are involved, and, because running two platforms only works if the data between them doesn’t get stuck, how Graitec File Sync acts as the connective layer that keeps Procore and Autodesk Forma working as one system instead of two.
Tech Tip: What are the main differences between Procore and Autodesk Construction Cloud (Forma)?
The core difference is what each platform is built around. Procore is a project management platform built around day-to-day construction execution, RFIs, submittals, daily logs, scheduling, and financials, and is widely used by general contractors. Autodesk Forma (ACC) is built around Autodesk’s design and BIM ecosystem, so it is strongest where model coordination, document control, and design collaboration between architects, engineers, and BIM/VDC teams matter most. Neither is a strict subset of the other; they overlap in areas like document management, drawings, and photos, but they are optimized for different workflows and different primary users.
What Procore is built for
Procore’s strength is in the operational layer of a project: RFIs, submittals, daily field reports, punch lists, scheduling, and cost and financial workflows in a single system that general contractors and site teams live in day to day. Its document and drawing tools support execution — tracking what’s current, what’s outstanding, and what’s overdue — rather than design authoring. For firms whose primary need is running the job site and managing the contractual and financial side of a project, Procore is usually the system of record.
What Autodesk Forma (ACC) is built for
Autodesk Forma sits inside the Autodesk ecosystem, which makes it the natural hub wherever model-based design is central to the project, architects, structural and MEP engineers, and BIM/VDC teams coordinating Revit models, drawings, and design documentation. Its strength is design collaboration and document control tied directly to the models the design team is producing. For owners and delivery partners whose priority is design coordination and a controlled, model-linked document environment, Forma is usually the system of record.
| Category | Procore | Autodesk Forma (ACC) |
| Primary users | General contractors, site and field teams | Architects, engineers, BIM/VDC teams, owners |
| Core strength | Project execution: RFIs, submittals, scheduling, financials | Design collaboration and model-linked document control |
| Ecosystem | Independent platform, broad third-party integrations | Native to the Autodesk design and BIM ecosystem |
| Document handling | Execution-focused: status, approvals, field use | Design-focused: versions tied to models and drawings |
| Typical primary owner on a project | The general contractor | The design team or the owner |
| Where it’s usually the system of record | Field operations and contractual workflows | Design coordination and the model-based document set |
Tech Tip: Is Procore or Autodesk Construction Cloud better for large projects?
Neither is categorically better; the right platform depends on which side of the project the question is being asked from. Large, complex projects tend to involve both a general contractor running Procore for execution and a design team or owner running Autodesk Forma for model-based coordination, which is precisely why the two platforms are so often found together on the same job rather than one having replaced the other.
Why most firms end up running both, not choosing one
The “vs” framing assumes a project has one construction management system. In practice, a single project usually has several stakeholders with different contracts, responsibilities, and standards — and each has a legitimate reason to prefer a different platform. A general contractor already standardized on Procore for financials and field operations has no reason to migrate. A design team or owner running Autodesk-centered BIM workflows has no reason to move design collaboration into a platform that isn’t built around it. Neither side is wrong, and neither platform is failing to do its job. This is the same dynamic covered in more depth in Why Contractors Struggle to Keep Procore and Autodesk Forma in Sync, the tools are both doing what they’re supposed to; the friction shows up in the gap between them.
What breaks when the two platforms aren’t connected
When a project genuinely needs both platforms and nothing links them, the cost shows up as manual work rather than a missing feature in either tool: documents downloaded from one system and re-uploaded into the other, RFIs or submittals re-keyed by hand, drawing sets that drift out of alignment, and metadata that has to be re-entered rather than carried across. None of this is a flaw in Procore or Autodesk Forma — it’s the predictable result of two well-built, independent systems that were never designed to talk to each other directly. File Sync addresses this by automating controlled data movement between them, rather than leaving it to whoever has time to do the re-upload.
File Sync: the link between Procore and Autodesk Forma
This is the gap Graitec File Sync is built to close. Rather than asking a project to standardize on one platform, File Sync sits between Procore and Autodesk Forma and keeps the data both sides depend on moving automatically, in either direction, on a schedule the project controls.
In practice, that means File Sync can:
- Synchronize documents and files between Procore and Autodesk Forma in either direction, preserving folder structure
- Keep drawings and sheets aligned between Forma Sheets and Procore Drawings
- Synchronize RFIs and submittals between the two platforms, including attachments, so neither team is re-keying the same information
- Carry supported metadata and version history across, so the design team’s model-linked context survives on the Procore side and vice versa
- Copy that same project data into a backup location your firm controls, on the same schedule as the sync itself
- Run on a schedule — daily, weekly, or as needed — so the connection is continuous rather than a one-time cleanup
The result is that the general contractor keeps working in Procore, the design team keeps working in Autodesk Forma, and neither has to leave their platform of choice to see what the other is doing. File Sync doesn’t ask a project to pick a winner between Procore and Autodesk Forma — it makes the choice unnecessary by keeping both systems current with each other.
This isn’t theoretical. CDS Mestel, a general contractor specializing in commercial retail and tenant fit-outs, used Graitec File Sync to move active projects from Procore into Autodesk Forma without pulling its project manager off live construction work, the same connective layer that keeps both platforms running in parallel for firms that aren’t migrating at all, just trying to keep two systems talking.
Tech Tip: Can Procore and Autodesk Forma be used together on the same project?
Yes, and on any project of meaningful size, they typically already are — a general contractor running Procore and a design team or owner running Autodesk Forma is one of the most common technology setups in construction. The practical question isn’t whether they can coexist, but how the data moves between them, which is where a sync layer like Graitec File Sync comes in.
Tech Tip: Does using both Procore and Autodesk Forma create duplicate work?
It does, if nothing connects them — documents, RFIs, and submittals end up manually re-created on both sides. It doesn’t have to: with a sync tool like Graitec File Sync configured between the two platforms, updates made in one system carry through to the other automatically, which removes the duplicate entry rather than the second platform.
Choosing your setup
Rather than asking “Procore or Autodesk Forma,” the more useful questions for a project team are:
- Who is the general contractor standardized on, and who is the design team or owner standardized on?
- Does the project need model-linked document control, execution-focused field management, or both?
- If both platforms are in play, which project data — documents, drawings, RFIs, submittals, metadata — actually needs to move between them, and how often?
- Who owns keeping that data aligned once both platforms are live: is it a manual task assigned to document control, or an automated sync?
For most projects past a certain size, the answer to the first three questions is “both platforms, and most of the data types.” The fourth question is where File Sync fits — turning a manual reconciliation task into a configured, scheduled workflow.

Running both, without the manual work in between
Graitec File Sync connects Procore and Autodesk Forma directly, so documents, drawings, RFIs, submittals, metadata, and versions move between them automatically.