ACC + Forma: The Big Move Toward Unified Design + Construction Workflows

23 October 2025AEC, autodesk, Autodesk Construction Cloud, Construction, DesignACC, AEC Industry, Collaboration, construction industry, construction management, data continuity, design collaboration, Forma, Integration, unified workflows

Carol Dunn

Partager

accforma-industry-cloud-blog-branded-oct2025.jpg

ACC + Forma, Forma industry cloud

Update – March 24, 2026: The transition described in this article is now complete. Autodesk Construction Cloud has officially been renamed Autodesk Forma, effective today. Read the full details on what’s changing, what’s not, and what it means for your workflows → Autodesk Construction Cloud Is Changing Its Name to Autodesk Forma 

The recent major Autodesk announcement about Autodesk Construction Cloud (ACC) and Forma sets the stage to reshape how the architecture, engineering and construction (AEC) industry works. ACC is now part of the Forma Industry Cloud. More than a product update, this is a strategic shift toward a truly unified platform for “design + construction” workflows. This means some big things for project teams.

New call-to-action

ACC Joins the Forma Industry Cloud

ACC will now be part of the Forma Industry Cloud. This move brings construction management tools directly into the same ecosystem as early-stage planning and design. Forma, which already supports real-time analysis, generative design and cloud-based collaboration, now connects seamlessly with the robust construction capabilities of ACC.

This integration marks a turning point for design and construction teams. It means that project data—from conceptual design to construction execution—can exist in one connected environment. There will be no need to switch between platforms, where users might duplicate work or lose context.


On-Demand Graitec Webinar:

Stay on Track – Tools to Align Teams and Project Schedules

Focus: Tools and strategies within ACC to improve team alignment, schedule management and real-time updates—key components of unified workflows.

Centers on ACC project coordination capabilities – highly relevant for teams preparing for the ACC + Forma integration, especially those looking to streamline design + construction workflows.

 


Importance of ACC + Forma Integration

The traditional handoff between design and construction has always been a pain point for project teams. Design teams typically work in one set of tools, construction teams in another, and the transition between them can lead to miscommunication and delays, not to mention rework.

With ACC integration, Forma users can now push models directly into ACC, where construction teams can begin planning, estimating and building without leaving the Autodesk ecosystem. A continuous thread of data and collaboration is created that spans the entire project lifecycle.

person's hand pointing at laptop screen, foreground white and blue data icons, blur background, ACC + Forma

Unified workflows can bring these advantages:

  • Designers use Forma to explore site conditions, run environmental analyses and develop early concepts.
  • Project teams transition those models into ACC, where they can manage documents, coordinate trades and track progress.
  • Stakeholders stay aligned by having real-time access to shared data, for less risk and better outcomes.

Implications for Project Teams

The shift toward unified workflows means project teams need to start thinking differently about how they plan and execute work. Here are a few key implications:

Earlier Collaboration

With ACC + Forma, construction teams can get involved earlier in the design process. This helps identify constructability issues before they become problems and also allows for more accurate budgeting and scheduling from the beginning.

computer servers sitting in clouds surrounded by vertical streams of data, Forma industry cloud

Data Continuity

Teams should prepare to work with models that evolve continuously from concept to construction. This requires a mindset shift: from static deliverables to dynamic, living data.

Familiar Platform

For teams that haven’t worked in Forma or ACC before, now is the time to get familiar with them. Autodesk is committed to building a future where these tools are deeply interconnected. Being fluent in both will be key to taking advantage of this new way of doing business.

Process Alignment

Unified workflows mean tighter coordination across disciplines. Teams should review their current processes and look for opportunities to align design and construction efforts more closely.

person working on laptop computer with icons hovering in foreground, ACC + Forma

Planning for the Shift

To make the most of this transition, project teams should:

    • Invest in training for Forma and ACC tools.
    • Establish shared standards for model development and data exchange.
    • Engage stakeholders early to ensure everyone understands the benefits of a unified platform.
    • Use smaller pilot projects on integrated workflows to build confidence and refine processes.

The move by Autodesk to bring ACC into the Forma Industry Cloud goes beyond a technical integration. It represents a vision for a more connected, collaborative future in AEC.

 

The ACC + Forma integration is a new chapter for companies in the industry to design and build. With the Forma Industry Cloud now encompassing construction tools, the barriers between design and execution are being removed. For project teams, this is an opportunity to rethink workflows, embrace collaboration and prepare for a future where everything from project concept to completion can happen in one unified environment. When teams embrace this shift, they can deliver better results from start to finish.


Not Sure What the Forma Means for Your Team? Get a personalized walkthrough of how the ACC → Forma change affects your workflows, licensing, and integrations.


3D BIM model city block, building highlighted aqua, Forma industry cloud To learn more about Forma and its capabilities, register for the on-demand Autodesk webinar “What is Autodesk Forma?”.

 

New call-to-action

Advance Design 2027 Open API — Reimagining Structural Engineering Workflows

18 June 2026Advance Design, AEC, BIMLukasz Jedrzejewski

With Advance Design 2027, Graitec introduces a significant step toward addressing these demands: the Advance Design Open API.

Graitec Heads to AIA Conference on Architecture & Design 2026 in San Diego

18 May 2026AEC, Architecture, Architecture and EngineeringGRAITEC Expert

Graitec is heading to the AIA Conference on Architecture & Design 2026, taking place June 10–13 at the San Diego…

Beyond BIM: How Immersive BIM, XR Collaboration and Holography Improve AEC Project Outcomes

8 May 2026AEC, BIMGRAITEC Expert

Learn how immersive BIM, XR collaboration and holography transform AEC projects with faster approvals, better alignment and stronger client confidence.