How to Migrate Construction Documents from Procore to Autodesk Forma (former Autodesk Construction Cloud)

10 July 2026Autodesk Construction Cloud, File Sync

GRAITEC Expert

Partager

file-sync-banner.webp

Migrating construction documents from Procore to Autodesk Forma (ex- Autodesk Construction Cloud) is rarely just a file transfer exercise. For most contractors, owners, BIM/VDC teams, and document controllers, the real challenge is making sure that project information remains complete, searchable, traceable, and usable after the move.

A successful migration needs to account for folder structure, document naming, metadata, versions, permissions, drawings, RFIs, submittals, photos, and validation. Without a controlled process, teams can end up with duplicate files, missing revisions, inconsistent metadata, or uncertainty about which platform holds the latest project record.

This article explains how to plan a Procore to Autodesk Forma document migration, what to check before you start, and how Graitec File Sync can help automate and validate the process.

Why migrate documents from Procore to Autodesk Forma (Autodesk Construction Cloud)?

Construction teams often use Procore and Autodesk Forma side by side. Procore may support project management workflows, while Autodesk Forma may be used for design coordination, document management, BIM/VDC collaboration, owner requirements, or long-term project information management.

A migration may be needed when:

  • A project is moving into an Autodesk-led delivery environment.
  • An owner or client requires documents to be stored in Autodesk Forma.
  • A contractor wants to consolidate project records for handover or closeout.
  • Teams need a controlled copy of Procore project information in ACC.
  • Data needs to be backed up, archived, or made available to design and delivery teams working in Autodesk tools.

The goal is not to position one platform against the other. Many construction organizations use both because different stakeholders need different workflows. The key is to move project data in a structured, auditable way.

Step 1: Define the migration scope

Before moving any documents, define exactly what needs to be migrated.

Start by confirming whether the migration includes:

  • Project files and document folders
  • Drawings or sheets
  • RFIs and attachments
  • Submittals and attachments
  • Photos
  • Metadata fields
  • File version history
  • Archived or closed project records
  • Only active documents, or the full project history

This is also the point to decide whether the migration is a one-time transfer or the beginning of an ongoing sync between Procore and Autodesk Forma. A one-time migration usually focuses on completeness and historical accuracy. An ongoing sync focuses on keeping active information aligned after the initial transfer.

Step 2: Audit your Procore document structure

A clean migration starts with a clear understanding of the source environment.

Review your Procore projects and document areas before configuring the transfer. Document controllers and project administrators should confirm which folders, files, and records are current, which are obsolete, and which should be excluded.

Key questions to answer include:

  • Which Procore projects are in scope?
  • Which folders should be migrated?
  • Should subfolders be included?
  • Are there naming conventions that need to be preserved?
  • Are there duplicate, superseded, or archived files that should be excluded?
  • Are documents grouped by discipline, package, stage, location, or status?
  • Are drawings, RFIs, submittals, and photos managed as structured records or as file exports?

This audit prevents the migration from becoming a “copy everything and sort it out later” exercise.

Step 3: Map the Autodesk Forma destination

Next, define where the documents will land in Autodesk Forma.

For each project, identify the ACC project, destination folder, and required folder structure. Some teams recreate the Procore structure in ACC. Others use the migration as an opportunity to align documents with an Autodesk Forma standard.

Your mapping should cover:

  • Source Procore project
  • Destination ACC project
  • Source folder or data type
  • Destination folder
  • Whether subfolders should be preserved
  • Whether metadata should be included
  • Whether all versions or only the latest version should be migrated
  • Who will validate the destination content

For larger migrations, it is usually best to start with a pilot project before scaling to multiple live projects.

Step 4: Confirm permissions and app setup

Migration depends on access. Even the best migration plan will fail if the right applications, admin approvals, and project permissions are not in place.

Before running a migration, confirm that:

  • The File Sync app is installed and authorized for Procore.
  • Autodesk Forma is configured correctly for File Sync.
  • The relevant user or service account has access to the required ACC projects.
  • The relevant Procore user has access to the required companies, projects, folders, and data types.
  • Microsoft 365, Windows folders, or backup locations are also authorized if they are part of the workflow.
  • IT has reviewed network, authentication, and security requirements.

For Autodesk Forma and BIM 360 environments, licensed File Sync deployments may require a customer-owned Autodesk Platform Services app or a server-to-server/service account configuration. This is especially important for scheduled or unattended workflows.

Step 5: Decide how to handle metadata

Metadata is often what makes a migrated document library useful. File names alone may not be enough for search, filtering, review workflows, compliance, or closeout.

Before migration, list the metadata fields that matter. These may include:

  • Status
  • Revision
  • Title
  • Discipline
  • Level
  • Location
  • Document type
  • Package
  • Approval status
  • Custom project fields

Then map each source field to the destination field in Autodesk Forma. Field names, formats, dropdown values, and required fields should be checked before the migration starts.

It is also important to test metadata on a small sample. This helps identify mismatched values, missing fields, or destination settings that need to be adjusted before the full migration.

Step 6: Decide whether to migrate all versions

Version history is one of the most important decisions in a Procore to ACC migration.

For some projects, migrating only the latest version is enough. For others, especially closeout, audit, legal, or owner handover scenarios, teams may need the full file version history.

Before choosing, consider:

  • Does the destination need the latest approved document only?
  • Does the project require a full revision trail?
  • Will migrating all versions significantly increase data volume?
  • Do source and destination platforms support the required version behavior?
  • Who will validate version stacks after migration?

All-version migration is typically best suited to one-time migration or audit-focused workflows, not routine scheduled syncs. For ongoing collaboration, teams should define how changes create new destination versions over time.

Step 7: Configure the migration workflow

Once scope, structure, permissions, metadata, and version requirements are clear, the migration can be configured.

With Graitec File Sync, the typical process is:

  1. Create or open a workspace.
  2. Create a sync.
  3. Select Procore as the source.
  4. Choose the relevant company, project, folder, or supported data type.
  5. Select Autodesk Forma as the destination.
  6. Choose the destination project and folder.
  7. Configure options such as subfolders, metadata, versions, filters, and schedules.
  8. Save and run the sync.
  9. Review the activity logs and destination output.

For document migrations, File Sync can support standard document copies, versioning, and custom metadata where supported by the connected platforms. It can also support broader Procore and ACC workflows, including structured data such as sheets, RFIs, submittals, and photos, depending on the use case.

Step 8: Validate before scaling

Validation should not be left until the end of a full migration. Run a controlled pilot first, then validate the results with the project team.

Check:

  • File counts
  • Folder structure
  • Sample file paths
  • Metadata values
  • Version history
  • Drawing or sheet output
  • RFI or submittal exports, if included
  • Attachments
  • Permissions and visibility
  • Activity logs, warnings, skipped files, and errors

File-level logs are especially important because they give teams a way to understand what transferred, what was skipped, and what needs attention. If files fail, retry processes should be defined before the migration is treated as complete.

Common migration risks to avoid

The most common Procore to ACC migration problems are not caused by the platforms themselves. They usually come from unclear scope, incomplete permissions, or insufficient validation.

Avoid these mistakes:

  • Migrating before defining success criteria
  • Copying every file without reviewing relevance
  • Ignoring metadata until after transfer
  • Assuming all version history is required
  • Forgetting to test attachments
  • Not involving document control early enough
  • Running a large migration without a pilot
  • Not reviewing logs before sign-off
  • Treating migration as a simple upload task

A structured migration reduces rework and gives project teams more confidence in the destination record.

How File Sync helps

Graitec File Sync is designed to help construction teams move, synchronize, and back up project data across the systems they already use. For Procore to Autodesk Construction Cloud migration, it provides a controlled way to define source and destination projects, preserve folder structure where required, include metadata and versions where supported, and validate outcomes through logs.

File Sync can also support broader workflows beyond migration, including ongoing Procore and ACC synchronization, backup to controlled locations, closeout exports, and project data sharing with platforms such as SharePoint, OneDrive, Windows folders, BIM 360, Bluebeam, Egnyte, and Dalux.

Final checklist before migration

Before migrating construction documents from Procore to Autodesk Forma, confirm:

  • Which projects and folders are in scope
  • Which data types must be included
  • Whether the migration is one-time or ongoing
  • Whether metadata must be preserved
  • Whether all versions or only latest versions are required
  • Which users or service accounts have access
  • Where the destination structure will be created
  • How results will be validated
  • Who will approve sign-off
How to Migrate Construction Documents from Procore to Autodesk Forma (former Autodesk Construction Cloud) | Graitec North America

Ready to plan your Procore to Autodesk Forma migration?

A successful migration starts with a clear data map and a controlled workflow. Graitec can help you assess your Procore and Autodesk Forma environment, identify what needs to move, and define the right File Sync workflow for migration, backup, collaboration, or closeout.

New call-to-action

Tech Tip: Using DesignCenter to Import Wires into AutoCAD Electrical

2 August 2021All, AutoCAD, ElectricalTodd Schmoock

AutoCAD Electrical has a tool inside the Create/Edit Wire Type dialog box called Import

How to Preserve Metadata When Migrating Construction Documents Between Procore and Autodesk Forma (ACC)

26 August 2026Autodesk Construction Cloud, Autodesk Forma, File SyncGRAITEC Expert

Learn how to preserve construction document metadata when migrating between Procore and Autodesk Forma (ACC): field mapping, supported field types,…