{"id":18286,"date":"2022-09-07T00:00:00","date_gmt":"2022-09-06T22:00:00","guid":{"rendered":"https:\/\/graitec-group.com\/asti\/?p=18286"},"modified":"2026-11-27T03:13:57","modified_gmt":"2026-11-27T08:13:57","slug":"using-cloud-based-model-coordination-to-reduce-rework","status":"publish","type":"post","link":"https:\/\/graitec.com\/us\/blog\/using-cloud-based-model-coordination-to-reduce-rework\/","title":{"rendered":"How Companies Use Cloud-Based Model Coordination to Reduce Rework"},"content":{"rendered":"\r\n<p class=\"wp-block-paragraph\">Research has shown that cloud-based construction technology is the key to reducing rework.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Maybe you remember the days when, limited by technology, digital designs and project models resided on <a href=\"https:\/\/graitec.com\/us\/avoiding-latency-in-your-remote-workforce-infrastructure\/\">individual<\/a> desktop computers or servers. Back then, sharing models with anyone outside the office was especially challenging. BIM (building information modeling) and VDC (virtual design and construction) managers were responsible for checking out every clash, big or small, during coordination meetings. The manual process was time consuming for everyone.<\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image size-full is-resized\">\r\n<figure class=\"alignnone nspb-cmsFigure nspb-loadingOverlay nspb-lazyLoading\"><img decoding=\"async\" class=\"wp-image-1010830\" src=\"https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/02\/.bim-coordination-autodeskcomau.jpg\" alt=\"\" width=\"779\" height=\"510\" \/><figcaption>BIM coordination<\/figcaption><\/figure>\r\n\r\n<\/figure>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Considering new consumer demands around <a href=\"https:\/\/graitec.com\/us\/how-to-trade-paper-based-systems-for-sustainability-in-construction\/\">sustainability<\/a> and safety, as well as rapid changes in innovation, labor shortages, and supply chain issues, construction projects are becoming more complex every day. Streamlined workflows are key to keeping projects within tighter schedules and budgets. <a href=\"https:\/\/adskconstruction.autodesk.com\/design-collaboration\/countdown-top-7-benefits-of-cloud-based-model-coordination\" target=\"_blank\" rel=\"noopener\">Cloud-based<\/a> solutions, like the <a href=\"https:\/\/graitec.com\/us\/the-promise-of-autodesk-construction-cloud\/\">Unified Platform<\/a> from Autodesk, are an important and necessary component for making this happen.<\/p>\r\n\r\n\r\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\r\n\r\n\r\n<p class=\"wp-block-paragraph\"><strong><em>From file size to view management, from worksets to worksharing, you should have this eBook in your eLibrary: \u201cHow to Keep Your Job with Revit.\u201d Download it today.<\/em><\/strong><\/p>\r\n\r\n\r\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Access to real-time <a href=\"https:\/\/graitec.com\/us\/ways-to-make-your-project-data-the-best-business-data\/\">data<\/a> through a cloud-based project gives teams the ability to make better informed decisions on a project.\u00a0In a McGraw Hill <a href=\"https:\/\/damassets.autodesk.net\/content\/dam\/autodesk\/www\/solutions\/building-information-modeling\/bim-value\/mhc-business-value-of-bim-in-north-america.pdf\" target=\"_blank\" rel=\"noopener\">SmartMarket<\/a> report \u201cThe Business Value of BIM in North America,\u201d about three-quarters of contractors using cloud-based tools reported better collaboration; two-thirds reported improved productivity.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Model <a href=\"https:\/\/graitec.com\/us\/how-bim-could-benefit-your-next-project\/\">coordination<\/a> in the preconstruction workflow ensures that the design intent can actually be constructed. It includes aligning multiple disciplines to coordinate a construction project so schedule and cost overruns can be avoided. According to the \u201c6<sup>th<\/sup> Annual JBKnowledge Construction Technology\u00a0<a href=\"https:\/\/jbknowledge.com\/wp-content\/uploads\/2018\/10\/2017-JBKnowledge-Construction-Technology-Report.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Report<\/a>,\u201d over half of general contractors believe model coordination is one of the most important benefits of using a BIM process in the project workflow.<\/p>\r\n<figure class=\"nspb-cmsFigure nspb-loadingOverlay nspb-lazyLoading\"><img decoding=\"async\" class=\"alignleft  wp-image-23416\" src=\"https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/05\/bim-mgr-shutterstock_1689999142-1-300x208.jpg\" alt=\"\" width=\"586\" height=\"406\" srcset=\"https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/05\/bim-mgr-shutterstock_1689999142-1-300x208.jpg 300w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/05\/bim-mgr-shutterstock_1689999142-1-1024x709.jpg 1024w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/05\/bim-mgr-shutterstock_1689999142-1-768x532.jpg 768w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/05\/bim-mgr-shutterstock_1689999142-1-1536x1063.jpg 1536w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/05\/bim-mgr-shutterstock_1689999142-1-160x111.jpg 160w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/05\/bim-mgr-shutterstock_1689999142-1-500x346.jpg 500w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/05\/bim-mgr-shutterstock_1689999142-1-1280x886.jpg 1280w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/05\/bim-mgr-shutterstock_1689999142-1.jpg 1920w\" sizes=\"(max-width: 586px) 100vw, 586px\" \/><\/figure>\r\n\r\n\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/graitec.com\/us\/moving-from-2d-to-bim-doing-and-becoming-something-new\/\">Rework<\/a> on the typical construction project can account for 20% or more of the total cost of completion \u2013 cutting into profits. But focusing on continuous improvement can help reduce rework, as described in \u201cA Guide to Construction Rework Reduction,\u201d by the Construction Industry Institute. The guide lists the steps as: tracking and evaluating rework and the reason(s) behind it; making a plan for corrective action; integrating changes into the project management system.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">According to a JBKnowledge Construction Technology Survey <a href=\"https:\/\/jbknowledge.com\/wp-content\/uploads\/2021\/01\/2020-Construction-Technology-Report.pdf\" target=\"_blank\" rel=\"noopener\">report<\/a>, fewer than 25% of companies use project management software to collect information from the jobsite, even though <a href=\"https:\/\/graitec.com\/us\/creating-a-data-strategy-that-works-for-your-construction-business\/\">data<\/a> collection on construction projects is critical.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">As explained in the FMI Construction Disconnected Report \u201cThe High Cost of Poor Data and Miscommunication,\u201d thanks to mobile devices, apps and software on construction jobsites, the industry is \u201cripe for <a href=\"https:\/\/graitec.com\/us\/product\/autodesk-industry-collections\/\">digitization<\/a>\u201d that could improve productivity. The report explains ways technology can reduce the miscommunication caused by poor project data that accounts for up to half of rework on projects.<\/p>\r\n\r\n\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">When the jobsite and office are <a href=\"https:\/\/graitec.com\/us\/3-ways-connected-bim-is-making-aec-more-sophisticated\/\">connected<\/a> through cloud-based software tools, companies see a significant return on investment. An <a href=\"https:\/\/constructionblog.autodesk.com\/innovation-is-purposeful-how-skanskas-sr-precon-technologist-drives-change\/\" target=\"_blank\" rel=\"noopener\">example<\/a>, citing Skanska, was shared by Autodesk Digital Builder in August 2022. The report explained that cloud-based construction technology can help workers avoid mistakes on the jobsite, so they can focus on moving the project forward rather than fixing mistakes.<\/p>\r\n\r\n\r\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\r\n\r\n\r\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\r\n\r\n<p>&nbsp;<\/p>\r\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Cloud-based solutions like the Unified Platform from Autodesk are an important component for construction model coordination to reduce rework.<\/p>\n","protected":false},"author":50,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[575,463,1795,593,1479,405],"tags":[1311,1571,1867],"class_list":["post-18286","post","type-post","status-publish","format-standard","hentry","category-architecture-and-engineering","category-autodesk-construction-cloud","category-connected-construction","category-construction","category-digital-transformation","category-revit","tag-cloud","tag-construction-cloud","tag-model-coordination"],"acf":[],"_links":{"self":[{"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/posts\/18286","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/users\/50"}],"replies":[{"embeddable":true,"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/comments?post=18286"}],"version-history":[{"count":0,"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/posts\/18286\/revisions"}],"wp:attachment":[{"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/media?parent=18286"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/categories?post=18286"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/tags?post=18286"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}