{"id":18587,"date":"2023-02-07T00:00:00","date_gmt":"2023-02-06T23:00:00","guid":{"rendered":"https:\/\/graitec-group.com\/asti\/?p=18587"},"modified":"2026-11-26T05:02:59","modified_gmt":"2026-11-26T10:02:59","slug":"mitigating-uncertainty-in-infrastructure-projects","status":"publish","type":"post","link":"https:\/\/graitec.com\/us\/blog\/mitigating-uncertainty-in-infrastructure-projects\/","title":{"rendered":"Mitigating Uncertainty in Infrastructure Projects"},"content":{"rendered":"\r\n<p class=\"wp-block-paragraph\">As explained by a 2019 ScienceDirect <a href=\"https:\/\/www.sciencedirect.com\/science\/article\/pii\/S2090447919300139\" target=\"_blank\" rel=\"noopener\">article<\/a>, development of infrastructure \u2013 i.e. airports, highways, bridges, railroads, ports, telecommunications \u2013 is one of the most important ways to boost business for multiple industries and increase a country\u2019s gross domestic product.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">With advancements in technology and operations, infrastructure projects have become larger and more complex, with a diverse set of contractors and subcontractors. Considering most bids are based on time and materials \u2013 both of which fluctuate \u2013 inevitably there is risk involved.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Because of supply chain issues, an inflation rate at a 40-year high and reduced buying power, the big infrastructure projects that were anticipated to begin chipping away at the country\u2019s funding-starved backlog don\u2019t seem to be materializing.<\/p>\r\n\r\n\r\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\r\n\r\n\r\n<p class=\"wp-block-paragraph\"><strong>Learn about Autodesk Construction Cloud in the free Applied Software, Graitec Group <\/strong><strong>eBook<\/strong><strong>: \u201cThe Importance of a Common Data Environment.\u201d<\/strong><\/p>\r\n<figure class=\"nspb-cmsFigure nspb-loadingOverlay nspb-lazyLoading\"><img decoding=\"async\" class=\"alignleft  wp-image-24113\" src=\"https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/02\/infrastructure-shutterstock_437140000-300x200.jpg\" alt=\"photo of infrastructure, steel bridge across a river, blue sky and yellow clouds near sunset\" width=\"678\" height=\"452\" srcset=\"https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/02\/infrastructure-shutterstock_437140000-300x200.jpg 300w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/02\/infrastructure-shutterstock_437140000-1024x683.jpg 1024w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/02\/infrastructure-shutterstock_437140000-768x512.jpg 768w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/02\/infrastructure-shutterstock_437140000-1536x1024.jpg 1536w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/02\/infrastructure-shutterstock_437140000-160x107.jpg 160w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/02\/infrastructure-shutterstock_437140000-500x333.jpg 500w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/02\/infrastructure-shutterstock_437140000-1280x853.jpg 1280w, https:\/\/graitec.com\/us\/wp-content\/uploads\/sites\/32\/2023\/02\/infrastructure-shutterstock_437140000.jpg 1920w\" sizes=\"(max-width: 678px) 100vw, 678px\" \/><\/figure>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image size-full is-resized\">\r\n<figcaption class=\"wp-element-caption\"><\/figcaption>\r\n<\/figure>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">As a January 2023 <a href=\"https:\/\/digital.bnpmedia.com\/publication\/?m=39147&amp;l=1&amp;pp=2&amp;view=issuelistBrowser&amp;oly_enc_id=9562G9978823G2N&amp;ver=html5\" target=\"_blank\" rel=\"noopener\">article<\/a> in Engineering News-Record describes, big infrastructure projects that are still design-bid-build are attracting fewer companies in the bidding process. In addition, officials are facing a discrepancy between what projects are now expected to cost as compared to their original estimates, potentially as old as a few years, during which the cost of certain construction materials may have doubled or tripled. Agencies behind some infrastructure projects have warned of possible delays or reduced project scope as inflation erodes their buying power. In a trickle-down effect, if contractors drop out because of issues with labor and materials, those projects need to be rebid.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Increasing use of <a href=\"https:\/\/graitec.com\/us\/7-statistics-on-innovative-building-methods\/\">design-build<\/a> processes using building information modeling (BIM) with <a href=\"https:\/\/graitec.com\/us\/applied-software-guide-to-revit\/\">Revit<\/a> could provide one way to deal with the uncertainties around infrastructure construction.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">With BIM, project teams can visualize a project model with a <a href=\"https:\/\/graitec.com\/us\/reality-capture-and-3d-modeling-to-assess-manage-aging-infrastructure\/\">reality capture<\/a> tool and detect design errors and <a href=\"https:\/\/graitec.com\/us\/product\/navisworks\/\">conflicts<\/a> at an early stage before they cost money or delay the schedule. BIM can also reduce waste and mitigate risks of volatile costs, which can become an exponential problem when materials <a href=\"https:\/\/graitec.com\/us\/how-to-save-50-of-your-time-producing-quantity-takeoffs\/\">counts\/quantities<\/a> are wrong.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">In December 2022, ConstructionDive.com <a href=\"https:\/\/www.constructiondive.com\/news\/construction-input-prices-decrease-supply-chains-improve\/638455\/\" target=\"_blank\" rel=\"noopener\">reported<\/a> that prices for softwood lumber, iron, steel, and steel mill products were dropping. The National Association of Home Builders also reported that truck freight transportation had slightly declined. Yet, there is still an element of guesswork involved in anticipating and <a href=\"https:\/\/graitec.com\/us\/keeping-up-with-autodesk-construction-cloud\/\">estimating<\/a> prices a year or two down the road. But that can be assuaged somewhat by the accuracy resulting from a BIM process.<\/p>\r\n\r\n\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">BIM and VDC (virtual design and construction) enable project teams to develop 3D models for precise planning \u2013 optimizing the use of materials, equipment and labor to reduce the risk of overruns. In addition, the use of BIM in the cloud during construction with a product like Autodesk <a href=\"https:\/\/graitec.com\/us\/product\/autodesk-docs\/\">Docs<\/a> enables teams to work collaboratively on a single model to coordinate effective outcomes. Software tools, standards, a common language, and shared templates, like those in Autodesk Build, can unite teams for the best project outcome. They can access the project model from any location and stay apprised of changes in real time. \u00a0<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Using photos, videos, details, markups, and other information contained in the 3D BIM model, <a href=\"https:\/\/graitec.com\/us\/how-to-look-smarter-by-leveraging-your-data\/\">data<\/a> doesn\u2019t get lost. Managers can track project progress, better allocate resources, and avoid hazards and delays.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Construction companies benefit from fostering relationships with all stakeholders, especially subcontractors, and having them participate in the construction project from the <a href=\"https:\/\/graitec.com\/us\/six-ways-to-profit-using-preconstruction-practices\/\">earliest stages<\/a> in a BIM process. Using tools on the Autodesk Construction Cloud platform allows predictability, productivity and reduced waste on current and future projects. Delivering better projects eliminates waste and reduces cost, making better use of available capital.<\/p>\r\n\r\n\r\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\r\n<p>&nbsp;<\/p>\r\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>use of design-build processes using BIM with Revit could provide one way to deal with the uncertainties around infrastructure construction.<\/p>\n","protected":false},"author":50,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[575,951,463,1795,593,1479,405],"tags":[509,2021,1391,2023,2025],"class_list":["post-18587","post","type-post","status-publish","format-standard","hentry","category-architecture-and-engineering","category-autodesk","category-autodesk-construction-cloud","category-connected-construction","category-construction","category-digital-transformation","category-revit","tag-autodesk-docs","tag-design-build","tag-infrastructure","tag-reality-capture","tag-vdc"],"acf":[],"_links":{"self":[{"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/posts\/18587","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/users\/50"}],"replies":[{"embeddable":true,"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/comments?post=18587"}],"version-history":[{"count":0,"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/posts\/18587\/revisions"}],"wp:attachment":[{"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/media?parent=18587"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/categories?post=18587"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/graitec.com\/us\/wp-json\/wp\/v2\/tags?post=18587"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}